Plant reports

Energy efficiency - 01/01/2013

Cooperativa Arroyo Bodonal

Promoter:  Cooperativa Arroyo Bodonal

Building contractor:  ACRE Arquitectura

Location:  Tres Cantos (Madrid)

The Arroyo Bodonal Cooperative started in 2003 in Tres Cantos, when a group of young people from the area decided to develop an 80-home complex with sustainable construction criteria, which would be energetically efficient and respect the environment. From the outset, the cooperative worked with ACRE Arquitectura for advice on choosing the land and designing the building project. Furthermore, Carlos Nieto Gómez, the project architect, formed part of the committee managing the development.

Buy Read Demo

Solar thermal - 01/01/2013

Central Solar Termoeléctrica Soluz Guzmán

Promoter:  FCC Energía-Mitsui

Building contractor:  UTE Termosolar Guzmán

Location:  Palma del Rio (Córdoba)

 

The solar thermal power plant Soluz Guzmán is located in the municipal district of Palma del Río, Córdoba. With installed capacity of 49.9 MWe, the plant uses cylindrical parabolic collectors in its solar park.  With an annual production of 108.5 m kWh, Soluz Guzmán will be able to cover the electricity needs of about 30,000 homes, avoiding CO2 emissions of over 108,500 t a year.

Buy Read Demo

Renewable energies - 07/01/2012

Smurfit Kappa Nervión

Promoter:  Smurfit Kappa

Building contractor:  Ghesa Ingeniería y Tecnología

Location:  Iurreta (Vizcaya)

Smurfit Kappa Nervión S.A. is an integrated producer of pulp and kraft paper for bags. It belongs to the Smurfit Kappa Group, a leading producer worldwide of paper and cardboard

based packaging. The company has successfully completed the modernisation of its industrial complex in Iurreta (Vizcaya). The plan concluded with the start-up of a biomass cogeneration plant. The new 21.4 MW steam condensation turbine has increased power generation capacity at the mill by over 40%, to more than 120,000 MWh per year of renewable energy. This represents an energy self-sufficiency rate of more than 65%.

Buy Read Demo

Renewable energies - 06/01/2012

Termosolar Morón

Promoter:  Grupo Ibereólica

Building contractor:  UTE Acciona-IDOM

Location:  Morón de la Frontera (Sevilla)

Grupo Ibereólica connected last month of May its first solar thermal power plant, located in Morón de la Frontera (Seville) For the design and construction of the solar thermal power plant and the exhaust electric infrastructures, Grupo Ibereólica trusted the experience and knowledge of Acciona and Idom. The main novelty the solar thermal power plant of Morón provides to the sector is its excellent management of water and waste, being considered a "zero wastes" power plant.

Buy Read Demo

Renewable energies - 04/01/2012

Valle I y II

Promoter:  Torresol Energy

Building contractor:  Sener

Location:  San José del Valle (Cádiz)

The CSP power plants Valle 1 and Valle 2 are twin facilities with a 50 MWe capacity each that use parabolic trough collectors technology covering respectively the second and third project by Torresol Energy, a joint venture between the technology group Sener and the company based on Abu Dhabi,Masdar.

Buy Read Demo